• HOME
  • CONTACT US
  • LANGUAGE

Business Results

Air Pollution Control

  • > Air Pollution Control
  • > Business Results


PROJECT PERIOD CAPACITY (㎥/day)
S3-B Air Pollution Control Facilities 2014 2014.02 ~ 2014.05
16L FAB rooftop exhaust facilities(Hwasung) 2013 2013.09 ~ 2014.09
V-PJT Deodorizer Multi Scrubber 2013 2013.12 ~ 2014.02
15L N-FREE Duct Construction for Deodorization 2013 2013.11 ~ 2013.11
3.4L Tank Replacement and other constructions For Greencenter, Cheonan 2013 2013.10 ~ 2014.02
Emergency Sump Deodorizer for Tangjeong 2013 2013.10 ~ 2013.12
Water Tank Cover System for Green 1-Dong, Hwasung Odor Zero Project 2013 2013.09 ~ 2013.12
Low concentration Deodorizer System for Green 1-Dong, Hwasung Odor Zero Project 2013 2013.09 ~ 2013.10
Tangjeong T/C Waste Water Treatment Plant 7-1 phase 2013 2013.08 ~ 2013.11
Samsung Electronics (Cheonan) WWTP Normalization Construction 2013 2013.08 ~ 2013.11
Machine(deoorization) design for Green 1-Dong, Hwasung Odor Zero Project 2013 2013.07 ~ 2013.12
Muharraq STP FRP Damper Ⅱ 2013 2013.05 ~ 2013.05
M-PJT Deodorizer System-On Shore 2013 2013.04 ~ 2013.09
M-PJT Deodorizer System-Off Shore 2013 2013.02 ~ 2013.09
M-PJT Exhaust Treatment System-PFC Scrubber 2013 2013.02 ~ 2013.12
FRP Cover manufacturing and installtion for Greenpia NF,HF Waste water facility expansion project 2013 2013.02 ~ 2013.03
Machine(deoorization) design for S3-A Waste water treatment facility 2013 2013.02 ~ 2014.05
A-PJT(S3-PJT succession) Odor Control Facilities 2012 2012.09 ~ 2015.12
Muharraq STP FRP Damper I 2012 2012.12 ~ 2013.01
Samsung Electronics (Giheung) 10L ABSORBER PILOT Installation Construction 2012 2012.08 ~ 2012.10


이전     [ 1 ] [ 2 ] [ 3 ] [ 4 ] [ 5 ] [ 6 ]     다음



ENTECH

CEO : Keun-Ho Choe CEO     2F, 513, Dosan-daero, Gangnam-gu, Seoul, Republic of Korea
E-MAIL : entech@entechenc.com     TEL : 02-2040-6996     FAX : 02-2040-6997

COPYRIGHTS (C) 2014 by Entech E&C Co., Ltd. ALL RIGHTS RESERVED.