PROJECT PERIOD CAPACITY (㎥/day)
Vietnam SDC LCD Module line Construction PCW Filter 2016 2016.08
Organic Wastewater Facility Systematization & Retrofit Construction 2016 2016.07 ~ 2017.04
Yeosu Thermal Power Plant Unit 1 FGD WWT System (350MWX1) 2016 2016.03 ~ 2016.08
SEMPHIL P4 DI SYSTEM 2016 2016.02~2016.10
SHMPHILE P4 WWT SYSTEM 2016 2016.02 ~ 2016.10
Pyeongtake Godeoc 1 step Green-Dong Facility Construction Sleeve production 2015 2015.09 ~2016.08
Electrical Oxidation WWT Facility Piping Construction 2015 2015.08 ~ 2015.12
Asan Green Center improvement 1-2 step Bioreactor Air Diffuser replace Piping Construction 2015 2015.08 ~ 2016.01
Electronics Electrical oxidation Facility (Electrolytic cell, Electrode bar, BUSBAR) 2015 2015.08 ~ 2015.12
Pyeongtake Godeoc 1 step Green-Dong sewage disposal plant Facility Construction 2015 2015.07 ~ 2015.12
Philippine P4 Project WWT system Process Design 2015 2015.09 ~ 2015.10
Vietnam HoChiMinh CE Complex WWT System 2015 2015.04 ~ 2016.03
Samsung SDI Xi’an, China SAPB EV Line#1 Waste Water Treatment System 2014 2014.11 ~ 2015.04
Tae-an Thermal Power Plant Unit 9,10 FGD WWT System 2014 2014.07 ~ 2016.12
Buk-pyeong Thermal Power Plant Unit 1,2 FGD WWT System 2013 2013.12 ~ 2016.07
POSCO Gwangyang Fe-Powder Plant (Cooling Water, Waste Water Treatment System) 2013 2013.08 ~ 2014.04
IBN RUSHD Anaerobic Digester 2013 2013.05 ~ 2013.06
Cheil Industries (Ochang) Emergency Sump Construction 2013 2013.05 ~ 2013.06
Dang-jin Thermal Power Plant Unit 9,10 FGD WWT System 2013 2013.04 ~ 2015.07
Tangjeong T.C Local Industrial Complex WWTP 5 phase 2013 2013.06 ~ 2013.07


이전     [ 1 ] [ 2 ]     다음



ENTECH

CEO : Keun-Ho Choe CEO     2F, 513, Dosan-daero, Gangnam-gu, Seoul, Republic of Korea
E-MAIL : entech@entechenc.com     TEL : 02-2040-6996     FAX : 02-2040-6997

COPYRIGHTS (C) 2014 by Entech E&C Co., Ltd. ALL RIGHTS RESERVED.